Skip to content

Paperboard Folding Cartons Sourcing

Write one procurement brief so this independent desk can organize factory wholesale quotes against the same carton construction. Brand configuration lists no street, switchboard, mailbox or social handle, so none is published and no map pin is drawn. The compact dialog on other pages reuses these backend fields; it is not a second intake desk.

What comparable quotes need

Format
Name the carton style (straight-tuck, reverse-tuck, crash-lock or auto-bottom), intended contents, paperboard grade and paperboard caliper in pt. Keep an SBS reverse-tuck body on its own quote line from a CCNB crash-lock pack. Side-seam glue chemistry belongs here: PVA cold-set and hot-melt are not substitutes without a new set-time and fiber-tear check. Window-patch adhesive sits on a second line when a film window is specified. Oxygen transmission rate and water vapor transmission rate, if needed, attach to that film file rather than to the paperboard body. ISO ICS 55.020, observed 2026-09-20, supplies unit vocabulary only; it is not a certificate this desk holds.
Artwork
State die line revision, color count and whether offset, flexographic printing, gravure printing or a digital short-run path is expected. Frequent SKU changes often favor digital print because plate cost drops; a locked four-color offset plus aqueous coating on a long retail run usually holds spot-color control better. If plates or cutting dies already exist, say who owns them after the first run. Foil or window-patch finish stay as named extras. This form has no upload control; describe the later file path in the requirement instead of inventing an attachment field. The Packhelp quote page reviewed on 2026-09-15 is a third-party briefing sequence, not a plant list or transit clock for this service.
Quantity
Write pieces or cartons per artwork. Plate, cutting-die, glue-setup and freight stay outside the piece price unless a plant writes them into that line. Do not mix two glue chemistries or two board grades in one quote cell. Optional target budget may name an amount or range, currency, and whether the figure is per piece or for the whole order. No existing quotation is required to submit. High-end, mid-range, economical or still-comparing describes finish and paperwork depth, not a verified factory rating.
Destination
Put the receiving US state or postal code in the requirement field so freight can be quoted to that destination. Add the requested delivery date and the product documents you will check on receipt: a mill sheet for the named board lot, a migration testing or food-contact file when the fill needs it, and any FSC or post-consumer recycled content claim only when the mill file matches that shipment. Those documents attach to a material and lot, not to this website as a badge. Food-contact approval, freight execution and converting stay with the named supplier on any later contract.

Sending the form opens a written brief, not a purchase order. After a live endpoint exists, the next step is to clarify missing identifiers and request factory replies against the same revision. Response clocks are unpublished because no service-level interval is configured. This desk does not publish a savings percentage and does not treat directory names as warehouse inventory.

Write the procurement requirement

Fields stack in one column. Include product format and intended contents; paperboard grade and paperboard caliper; carton style and die line status; side-seam or window-patch adhesive; print colors, finish and sample needs; quantity by specification or artwork; destination state or postal code and requested delivery date; required product documents. Optional budget and supplier preference merge into the same requirement field when JavaScript is available; otherwise write them in the box. Repeat submit or a browser back-forward cycle should not leave an old product or preference summary in the form.

Write format and intended contents; quantity by specification or artwork; material, size, barrier or board grade; print colors, finish and sample needs; destination state or postal code and requested delivery date; required product documents. Optional target budget with currency and unit or whole-order basis; optional supplier preference (high-end, mid-range, budget or undecided). Drawings and die line files can be described after we reply; this form has no upload field.